Figure 2.9 – Rockwell Automation GV3000/SE AC Drive ControlNet Network Communication Board, M/N 2CN3000 User Manual

Page 31

Advertising
background image

Installation

2-19

Step 4.

Install the ControlNet Option Board in the Keypad Bracket

Refer to figures 2.8 and 2.9.

Step 4.1 Remove the ControlNet option board from its anti-static wrapper.

Step 4.2 Align the key on the connector of the ControlNet option board ribbon cable

with the key on the Regulator board connector. Press the ribbon cable
connector in until it locks into position.

Step 4.3 Route the other ribbon cable out of the side of the keypad bracket.

Step 4.4 Align the ControlNet option board on the four mounting tabs on the keypad

bracket. Make sure that the ribbon cable is not pinched between the keypad
bracket and the ControlNet option board.

Step 4.5 Fasten the right side of the ControlNet option board to the keypad bracket.

Use the two metal M3 screws and lock washers for grounding.

Important: You must use the lock washers to properly ground the option board.

Improper grounding of the option board can result in erratic operation of
the drive.

Figure 2.9 – Regulator Board’s Connections to Option Board, Keypad, and Base Board

Regulator Board

Top View

Ribbon Cable
Connecting
Regulator Board and
Base Board

Network

To Base Board

Front

Ribbon Cable
Connecting
Regulator Board and
Option Board

Metal Screw

Ribbon Cable
Connector to
Connect Base
Board

Ribbon Cable
Connector to
Connect Keypad

Plastic Rivet

Terminal Strip

Ribbon Cable
Connector to
Connect Option
Board

Back Side of

Insulator

Rear View of Regulator Board

Regulator Board

Option Board

Advertising