2 installation of the post column reactor, Installation of the post column reactor, E 96 – Metrohm 844 UV/VIS Compact IC User Manual

Page 48: 98 f, Coupling 93, D end of pump tubing 94, Device" 99, Tubing 94 i, 95 sh

Advertising
background image

Table of contents

94 Pump tubing 6.1826.320

for reagent

95 Stopper (orange-yellow)

96 Tubing cartridge (6.2755.000)

97 Contact pressure lever

for adjusting the contact pressure

98 Snap-action lever

for releasing the tubing cartridge

99 PEEK coupling with filter and

tubing security device 6.2744.180

100 Connection capillary

PTFE Capillary 6.1803.150,

length L = 20 cm

2.7.2

Installation of the post column reactor

The installation procedure is as follows:

1 Attach PCR holder 102

• Push the PCR holder with the strip on its rear panel onto

lower mounting rail 44.

2 Insert post column reactor 101 in PCR holder 102

• Insert post column reactor 101 into PCR holder 102 with its

tubing connections facing upward.

Push PCR holder 102 with post column reactor 101 as far

downward as possible.

Advertising