2 installation of the post column reactor, Installation of the post column reactor, E 96 – Metrohm 844 UV/VIS Compact IC User Manual
Page 48: 98 f, Coupling 93, D end of pump tubing 94, Device" 99, Tubing 94 i, 95 sh
Table of contents
94 Pump tubing 6.1826.320
for reagent
95 Stopper (orange-yellow)
96 Tubing cartridge (6.2755.000)
97 Contact pressure lever
for adjusting the contact pressure
98 Snap-action lever
for releasing the tubing cartridge
99 PEEK coupling with filter and
tubing security device 6.2744.180
100 Connection capillary
PTFE Capillary 6.1803.150,
length L = 20 cm
2.7.2
Installation of the post column reactor
The installation procedure is as follows:
1 Attach PCR holder 102
• Push the PCR holder with the strip on its rear panel onto
lower mounting rail 44.
2 Insert post column reactor 101 in PCR holder 102
• Insert post column reactor 101 into PCR holder 102 with its
tubing connections facing upward.
• Push PCR holder 102 with post column reactor 101 as far
downward as possible.