9 detector, 1 installing the flow-through cell, Detector – Metrohm 844 UV/VIS Compact IC User Manual

Page 60: Installing the flow-through cell, Figure 25, Flow-through cell installation, Ion 2.9, Let "in" 131 of, Ion 2.9 )

Advertising
background image

Table of contents

2.9 Detector

The 844 UV/VIS Compact IC is equipped with UV/VIS detector. The

eluent (and the sample) are led through a measuring cell (flow-through

cell

42/62) and measured spectroscopically. The available light

sources are a UV (deuterium) lamp and a VIS (halogen) lamp.

2.9.1

Installing the flow-through cell

With the 2.844.0030 und 2.844.0130, the flow-through cell is already

pre-installed!

Figure 25: Flow-through cell installation

42 6.2839.130 Flow-through cell PEEK

62 6.2839.100 Steel flow-through cell

129 Optical bank

130 Flow-through cell outlet "OUT"

Eluent outlet

131 Flow-through cell inlet "IN"

Eluent inlet

132 Knurled screws

For fastening flow-through cell 42/62.


To install flow-through cell

42/62 proceed as follows:

1 Remove blank cover

• Optical bank 129 is delivered with a blank cover. This should

be removed.

42/

62

130

132

131

129

Advertising