2.10 Putting into operation

844 UV/VIS Compact IC / Gebrauchsanweisung 8.844.1051

51

• Select the

Connect to workplace

item from the

Control

menu of

the system window.

2 Open control window

• Double-click on the 844 icon in the system window. The

control window for manual operation of the 844 UV/VIS

Compact IC appears. Open the subtab

Controls

and set the

system parameters (see Section 3.3.1).

Make sure that the set flow does not exceed the maximum

permissible flow for the particular column (see column data

sheet).

3 Start system

• Make sure, that the aspirating tubing 82 for the high-pressure

pump is immersed in the eluent.

• In the

Control

menu in the system window select the item

Startup hardware (Measure baseline)

. The high-pressure pump