Putting into operation with post column reactor – Metrohm 844 UV/VIS Compact IC User Manual
Page 63
2.10 Putting into operation
844 UV/VIS Compact IC / Gebrauchsanweisung 8.844.1051
51
• Select the
Connect to workplace
item from the
Control
menu of
the system window.
2 Open control window
• Double-click on the 844 icon in the system window. The
control window for manual operation of the 844 UV/VIS
Compact IC appears. Open the subtab
Controls
and set the
system parameters (see Section 3.3.1).
Make sure that the set flow does not exceed the maximum
permissible flow for the particular column (see column data
sheet).
3 Start system
• Make sure, that the aspirating tubing 82 for the high-pressure
pump is immersed in the eluent.
• In the
Control
menu in the system window select the item
Startup hardware (Measure baseline)
. The high-pressure pump