LAARS NeoTherm NTV1000 - Install and Operating Manual User Manual

Page 54

Advertising
background image

LAARS Heating Systems

Page 50

System 4 –

Multiple boilers, Local control, Outdoor reset

Job B

Set up the names for each of the controllers

Job C

Make one control the Lead/Lag master

Job D

On each of the controllers that will act as a slave, disable the Lead/Lag Master

Job E

Set up the Modbus control addressing to assign addresses for each of the controls

Job F

Set up the addresses for the flap valves

Job G

Disconnect the Operator Interfaces that will not be used

Job H

Connect the Modbus wiring

Job I

Set the parameters used by the Lead/Lag system

Job J

Install the System sensor and adjust the setpoint

Job K

Lead/Lag outdoor reset and warm weather shutdown

Job O

Set up the combustion on each of the burners

Job P

Set the date and time on the system

System 5 –

Multiple boilers, Local control, Common vent

Job A

Note on common venting

Job B

Set up the names for each of the controllers

Job C

Make one control the Lead/Lag master

Job D

On each of the controllers that will act as a slave, disable the Lead/Lag Master

Job E

Set up the Modbus control addressing to assign addresses for each of the controls

Job F

Set up the addresses for the flap valves

Job G

Disconnect the Operator Interfaces that will not be used

Job H

Connect the Modbus wiring

Job I

Set the parameters used by the Lead/Lag system

Job J

Install the System sensor and adjust the setpoint

Job O

Set up the combustion on each of the burners

Job P

Set the date and time on the system

System 6 –

Multiple boilers, Local control, Common vent, Outdoor reset

Job A

Note on common venting

Job B

Set up the names for each of the controllers

Job C

Make one control the Lead/Lag master

Job D

On each of the controllers that will act as a slave, disable the Lead/Lag Master

Job E

Set up the Modbus control addressing to assign addresses for each of the controls

Job F

Set up the addresses for the flap valves

Job G

Disconnect the Operator Interfaces that will not be used

Job H

Connect the Modbus wiring

Job I

Set the parameters used by the Lead/Lag system

Job J

Install the System sensor and adjust the setpoint

Job K

Lead/Lag outdoor reset and warm weather shutdown

Job O

Set up the combustion on each of the burners

Job P

Set the date and time on the system

Advertising
This manual is related to the following products: