Job o – combustion setup procedure – LAARS NeoTherm NTV1000 - Install and Operating Manual User Manual

Page 79

Advertising
background image

NeoTherm Boilers and Water Heaters

Page 75

Fig. 98 – Lead Lag Central Heat Configuration

3. Change the 4 mA water temperature to match

the lowest water temperature setting on the

Building Automation System or multiple boiler

control.

4. Change the 20mA water temperature to match

the highest water temperature setting on the

Building Automation System or Multiple boiler

control.

Job n - Building automation or multiple

Boiler 4-20 ma modulation Control

(This is an individual function – do this on each of the controls.)

In this type of installation, the fan speed of each

boiler is changed or modulated by a source outside

of the boiler. All active burners must operate at the

same modulation rate while operating. The system

will not operate correctly if some of the burners are

being asked to operate at full rate while other burners

are operating at minimum rates.

1. On each controller in the system, check

terminals 5 and 6 on TB7 to ensure that the

System sensor is not connected. (For this type

of operation, the Lead/Lag system is disabled.)

2. Connect the 4-20 mA input to each controller in

the system.
• On the Primary controller in each boiler,

connect to terminals 3 and 4 on TB7.

• On the Secondary controller in each boiler,

connect to terminals 7 and 8 on TB7.

3. Enable a central heat call for each control

on the system. This function must be set up

for each controller separately. This function

operates outside of the Lead/Lag system.

How to get there – Central Heat Enable

Home Page <Press the icon for one of the controllers>

Boiler 1 Primary Screen <Press Configure button> Boiler
1 Primary Configuration Screen <Press Left- or right-
arrow button> Central Heat

4. Fig. 99 shows the setup screen.

Fig. 99 - Central Heat Configuration

5. Enable the Central Heat function on the top

line. Give the CH function the priority using

the lower line.

Job o – Combustion Setup Procedure

(These are individual functions. Do the combustion setup for
each of the burners.)

In this section, we will explain how to set up the gas

valve so both burners in each boiler run efficiently

at both the High Fire and Low Fire conditions. As

we said, a boiler includes two controllers (Primary

and Secondary), which control two burners (Primary

and Secondary). See Fig. 100. Each burner has

a separate gas valve, and each of these must be

set up separately. Here’s a quick summary of the

procedure:

You shut off one controller/burner

combination, and work with the other.

You set the working burner to run at High

Fire, and adjust the gas valve to get the correct

CO

2

reading.

Next you set the same burner to run at Low

Fire, and make another adjustment on the gas

valve to get the desired CO

2

reading.