Job c – make one control the lead/lag master – LAARS NeoTherm NTV1000 - Install and Operating Manual User Manual

Page 61

Advertising
background image

NeoTherm Boilers and Water Heaters

Page 57

Fig. 56 - System Identification and Access

5. Go down to the line for Boiler Name to change

the name of the control. In this example, we are

working with the Primary control on Boiler 1,

so the name here should be “Boiler 1 Primary.”

To change the entry, press on the line for Boiler

Name. The system will present the keyboard

screen. Use the “BS” (BackSpace) key to erase

the existing name. Enter the new name, then

press OK.

6. Now you can rename the other control on

Boiler 1 – the Secondary control. Press the

Home button in the top left-hand corner to

go back to the Home screen which shows the

different controls (Fig. 53).

7. This time, press the icon for the Secondary

control. Repeat steps 1 through 5. Change the

name to “Boiler 1 Secondary.”

8. Go to the Operator Interface for the next boiler

in the system. Repeat steps 1 through 7 for

each of the controllers on that boiler. Be sure

the names you enter are correct – each name

should indicate the Boiler number and whether

the control will operate as the Primary or

Secondary.

9. Repeat the process for any other boilers in the

system.

Job C – make one Control the lead/lag

master

(This is an individual function – do this once for the control that
will act as the Lead/Lag Master. Use the Operator Interface on
Boiler 1.)

The Lead/Lag control system uses one controller as

the Lead/Lag Master. This controller supervises the

operation of the other controllers, and they all operate

together as part of the Lead/Lag system. There is

only one Lead/Lag Master in the system. Usually,

the controller used for this is the Primary controller

on Boiler 1. (Other controls in the system can be set

as the Lead/Lag Master, but we do not recommend

this because it may complicate troubleshooting and

technical support questions.)
The controller used as the Lead/Lag Master will also

do a second job, operating as Slave 1 in the Lead/

Lag system. A single controller performs both of

these functions. When it arrives from the factory, the

controller used for this should already be set up as a

slave – we will check that in a moment. For now, we

will just concentrate on enabling the Master function.

1. From the Home screen, press the View Lead

Lag button. See Fig. 57.

fig. 57 – Home Screen

Advertising
This manual is related to the following products: