LAARS NeoTherm NTV1000 - Install and Operating Manual User Manual

Page 59

Advertising
background image

NeoTherm Boilers and Water Heaters

Page 55

System 22 –

Multiple boiler, System control, Common vent, 4-20 mA modulation control, Outdoor reset

Job A

Note on common venting

Job B

Set up the names for each of the controllers

Job C

Make one control the Lead/Lag master

Job D

On each of the controllers that will act as a slave, disable the Lead/Lag Master

Job E

Set up the Modbus control addressing to assign addresses for each of the controls

Job F

Set up the addresses for the flap valves

Job G

Disconnect the Operator Interfaces that will not be used

Job H

Connect the Modbus wiring

Job I

Set the parameters used by the Lead/Lag system

Job N

Building automation or multiple boiler control 4-20 mA modulation control

Job K

Lead/Lag outdoor reset and warm weather shutdown

Job O

Set up the combustion on each of the burners

Job P

Set the date and time on the system