3 - component listing – Dunkirk Helix VLT Vertical Laser Tube, Wall Hung Modulating Condensing Boiler User Manual

Page 10

Advertising
background image

10

FIGURE 3-5 Boiler Components 299 MBH (View from Front of Boiler)

(18) GAS SHUTOFF

VALVE

(SHOWN IN OPEN

POSITION)

(25) VENT CONNECTOR

(20) GAS (CONTROL)

VALVE

(22) LOW WATER

CUTOFF

(21) SUPPLY WATER

TEMPERATURE SENSOR &

HIGH LIMIT SWITCH

(23) SAFETY RELIEF VALVE

(28) AIR VENT

(2) COMBUSTION

AIR INLET

NOTE:

See Section 5

For Piping

Instructions

(17) HEAT EXCHANGER

PUMP

(10) CONDENSATE

COLLECTOR

(3) RETURN WATER

FROM HEATING

SYSTEM (IN)

(14) SUPPLY WATER TO

HEATING SYSTEM (OUT)

(4) LOW VOLTAGE

TERMINAL STRIP

(33) COMBUSTION

ANALYSIS TEST

PORT

(26) GAS CONNECTION

(24) HIGH VOLTAGE

JUNCTION BOX

(9) HEAT

EXCHANGER

(29) BOILER CONTROL

MODULE

Fuse and Holder

(6) FLAME SENSOR

(16) CONDENSATE

DRAIN

(31) TRANSFORMER

(13) INTERNAL PRIMARY

LOOP BALL VALVE

(19) BLOWER

VENTURI

(35) HEAT

EXCHANGER SURFACE

TEMPERATURE SWITCH

(34) INTERNAL

PUMP RELAY

(7) SIGHT GLASS &

(5) IGNITER

(15) VENT TEMPERATURE

SENSOR

(11) RETURN

TEMPERATURE

SENSOR

3 - COMPONENT LISTING

(36) ASME

PLATE

Advertising