Warning, Caution – Dunkirk Helix VLT Vertical Laser Tube, Wall Hung Modulating Condensing Boiler User Manual

Page 12

Advertising
background image

12

4.2

Pre-pipe supply and return water connections

with factory fittings before wall mounting.

4.3 Wall Mounting

Mount boiler on wall using wall mounting bracket included

with unit.

• Structure must be capable of supporting boiler weight

plus 60 lbs (28 kg). See Table 1, page 2.

• Wall mount bracket has 4 slots allowing mounting on

two (2) wall studs spaced at 11½" to 16½" on center.

See figure 4-2.

• Boiler includes (4) 3/8" x 3" lag screws and (4) washers

for attaching wall mount bracket to wood studs. Field

source appropriate fasteners for other wall constructions

(masonry, concrete).

• Attach wall mount bracket level on wall.
• Boiler must engage with wall mount bracket.
• Avoid overhang on sides of wall mount bracket. Verify

boiler bracket is centered on wall bracket. See figure

4-2.

WARNING

Fire, explosion hazard. Mount boiler vertically or

slightly tilted backward to insure proper function of

low water cutoff. Failure to follow these instructions

could result in death or serious injury.

• When mounting boiler onto wall insert two plastic

stoppers and two plastic plugs to packaging holes on

back of boiler. See parts listed on page 2, number 17

and 18.

• Mount boiler vertically or slightly tilted backward to

insure the low water cutoff functions properly. See

figure 4-3 for low water cutoff orientation.

FIGURE 4-2 Wall Mount Bracket Engaged with

Bracket on Boiler

CAUTION

Boiler weight exceeds 75 pounds (34 kg). Do not

lift boiler onto wall without assistance.

!

4 Slots for attaching

Wall Mount Bracket

to Studs

NOTICE

Lift boiler using chassis. Using front jacket, vent

piping, water or gas fittings to lift boiler may cause

damage to the boiler.

Center brackets. Avoid

overhang on sides of

wall mount bracket.

4 - LOCATING BOILER

FIGURE 4-3 Low Water Cutoff Orientation

5° ~ 15°

Factory Default

10°

Advertising