Caution, Danger – Dunkirk Helix VLT Vertical Laser Tube, Wall Hung Modulating Condensing Boiler User Manual

Page 43

Advertising
background image

43

11.1 Beginning of Each Heating Season

• Check boiler area is free from combustible materials,

gasoline, and other flammable vapors and liquids.

• Visually inspect combustion air and vent piping for

proper operation. Check for and remove any obstruction

to flow of combustion air or vent gases. Immediately

repair or replace pipe showing deterioration or leakage.

Reassemble per instructions in section 6. Ensure proper

reassembly and resealing of system.

• Visually inspect condensate drain line for proper

operation. Checking for deteriorated or plugged

condensate drain line. Verify condensate trap drains

freely.

• Test safety relief valve for proper operation. Refer to

valve manufacturer's instructions packaged with relief

valve.

• Examine flue passages in heat exchanger, burner,

condensate lines, and cleaning (if necessary) by following

instructions in “Annual Examination and Cleaning of Boiler

Components” in this section.

• Circulator pump and combustion air blower motor

furnished with boiler are permanently lubricated from

factory and require no further lubrication. Lubricate field

sourced pumps and/or motors according to pump and/or

motor manufacturer’s instruction.

• Check following components are operating properly and

are free of blockages or obstructions:

• air vent;
• check venturi air inlet for blockage and clean as

required;

• verify pressure test port cap and combustion test port

are in place;

• return temperature sensor clip must be securely

seated on pipe; Check boiler for any sign of leaks.

• Check low water cutoff using user interface.

• Check operation by pressing test button on low water

cutoff.

• "Low Water" LED should illuminate and burner

should shut down.

• Should get error message on User Interface

(E36).

• Every 5 years remove low water cutoff. Reinstall

after cleaning.

• Every 10 years replace low water cutoff.

• Check flame signal with user interface. Should be 8

micro

amps at 100% firing rate ( High fire).

• Visual inspection of flame through sight glass. Burner

should be fully illuminated. See

figures 11-1 & 11-2.

• Check heating system expansion tank.

CAUTION

Label all wires prior to disconnection when servicing

controls. Wiring errors can cause improper and

dangerous operation.

!

NOTICE

Verify proper operation after servicing.

NOTICE

Perform regular service and maintenance by

qualified service agency at least once every 12

months to assure safe, trouble free operation and

maximum efficiency.

FIGURE 11-1 Sight Glass - 050/075/100/150/200 MBH

DANGER

Before servicing, turn off electrical power to boiler

at service switch. Close manual gas valve to turn

gas supply OFF to boiler. Failure to comply will

result in death or serious injury.

!

FIGURE 11-2 Sight Glass - 299 MBH

Sight Glass

Sight Glass

11 - GENERAL MAINTENANCE AND CLEANING

Advertising