9.4 Boiler Start-up and Operational Test

1.

Verify air is purged from hydronic piping

2.

System test pumps - verify each pump is

operational

3.

Verify gas piping

• Confirm pressure test. See section 7.3.
• Visually inspect piping to determine there are no

open fittings or ends, and all valves at unused

outlets are closed and plugged/capped.

• Purge air from piping
• Check piping and connections for leaks

immediately after gas is turned on. Shut off

gas supply and make necessary repairs if leaks

found.

4.

Follow OPERATING INSTRUCTIONS to initiate boiler

operation. See section 10.

5.

Inspect combustion air and vent piping. Verify pipe

is not leaking and terminations are unobstructed

and vent gas discharge is not a nuisance or hazard.

6.

Verify boiler functions.

7.

Inspect condensate disposal system. Verify

condensate flows adequately and is disposed

properly.

8.

Check control module operation.

9.

Check field sourced limits, low water cutoffs, etc.

per manufacturer's instructions.

9.5 Check Combustion

Natural Gas

1.

Measure input. English units*

• Turn off gas to all other appliances.
• Activate some heating zones to dissipate heat.
• Set boiler on high fire.
• Use ½, 1 or 2 cu ft dial on gas meter. Measure

time required for one or more complete

revolutions. Measure time for 1-2 minutes.

• Calculate input.

Input (MBH)

=

3600 x cu ft
seconds

Example: Gas flow from

Meter = 2 cu ft

Measured time = 72 seconds

Rate (MBH)

=

3600 x 2 cu ft

=

100 MBH

72 seconds

*Metric - See Glossary

2.

Compare measured input to table. Adjust input rate

if needed using Table 12 below.

Table 1

2 - Rate @ High Fire

Rate @ High Fire

Size

From

To

050

45

51

075

65

76

100

90

102

150

140

153

200

185

204

299

285

315

Natural Gas and Propane

3.

Measure CO

2

at high fire and compare to table.

Adjust CO

2

if needed using figure 9-3 & 9-4. See

figures 9-5 and 9-6 for combustion air analyzer

port.