Dunkirk Helix VLT Vertical Laser Tube, Wall Hung Modulating Condensing Boiler User Manual

Page 28

Advertising
background image

28

Doors &

Windows

Combustion air and vent termination

must be 12" (305mm) from or below

doors, windows or gravity inlet.

Forced Air

Inlet

Terminate venting system 3’ (0.9m)

above and 10' (3.0m) from any forced

air inlet (except boiler’s combustion

air inlet).

"L"

Corner

Vent termination shall NOT be installed

closer than 3' (0.9m) from inside

corner of “L” shaped structure.

Grade, Snow

& Ice

Terminate vent system bottom,

minimum 12" (300 mm) above highest

anticipated snow level.

Avoid locations where snow may drift

and block vent and combustion air. Ice

or snow may cause boiler to shut down

if vent or combustion air becomes

obstructed.

Condensate

Vent gas may condense, forming

moisture, may be corrosive. Protect

building materials at vent from exhaust

of vent gas.

Termination must be

12" (305mm) from

or below doors,

windows or gravity

inlet.

12"

(305mm)

Minimum

Termination

Forced Air

Inlet

3' (0.9m)

[If located

within 10' (3m)

of forced air

inlet]

Termination

Less than

10' (3m)

Minimum

3' (0.9m)

Minimum

FIGURE 6-12

FIGURE 6-13

FIGURE 6-14

6.7 Side Venting Terminal Requirements of

:

• USA - National Fuel Gas Code, ANSI 223.1/NFPA 54.

Venting terminal from doors and windows

See figure 6-12

Venting terminal from forced air inlet of other appliances See figure 6-13
Venting terminal from snow level

See figure 6-14

Venting terminal from vegetation

See figure 6-15

Venting terminal from public walkway

See figure 6-16

6 - COMBUSTION AIR AND VENT PIPING