Dhw sett ings, Syst em test, Appendix a - control module – Dunkirk Helix VLT Vertical Laser Tube, Wall Hung Modulating Condensing Boiler User Manual

Page 82

Advertising
background image

82

User Interface Display

Explanation

DHW Sett

ings

Allowed Range: 1 to 60 Minutes

Default Setting: 30 Minutes

Maximum time boiler operates in DHW mode limited by DHW

Maximum Priority Time Setting.
Priority timer starts when both CH and DHW demand is

present. Boiler will switch from DHW back to CH operation after

Maximum Priority Time has elapsed.
CH demand then has priority until Maximum Priority Time has

elapsed.
Process repeats until either CH or DHW demand satisfied.

Syst

em Test

System test can be activated via installer menu for testing

system at fixed power rates.
Boiler can be started without CH or DHW demand being

present. System Test has priority over any system demand

while test mode activated.
System test mode automatically ends after 30 minutes boiler

resumes normal operation.
The following modes are available:

• Disabled
• Low power - Burner starts. After ignition period has

finished the burner stays at low power

• Ignition power - Burner starts. Stays at ignition power
• High power - Burner starts. After ignition period has

finished burner stays at high power.

Note:

• Before running system test modes, check if hydronic

system capable of dissipating heat.

• Both heat exchanger and CH pumps are activated during

system test.

• During System Test Mode, boiler will run at fixed power

rates until supply water temperature is 93°C/195°F

• All other safety functions remain active while in System

Test Mode.

APPENDIX A - CONTROL MODULE

Advertising