Caution – Dunkirk Helix VLT Vertical Laser Tube, Wall Hung Modulating Condensing Boiler User Manual

Page 32

Advertising
background image

32

7.1 General

• Use piping materials and joining methods acceptable

to authority having jurisdiction. In absence of such

requirements:

• USA - National Fuel Gas Code, ANSI Z223.1/NFPA

54

• Size and install gas piping system to provide sufficient

gas supply to meet maximum input at not less than

minimum supply pressure. See Table 10.

• Support piping with hooks straps, bands, brackets,

hangers, or building structure components to prevent or

dampen excessive vibrations and prevent strain on gas

connection. Boiler will not support piping weight.

• Use thread (joint) compound (pipe dope) suitable for

liquefied petroleum gas.

• Provide sediment trap up stream of gas valve.
• Install manual main shutoff valve outside of jacket. See

figure 7-2.

7.2 Conversion Kit Instructions

• See Gas Conversion Kit Instructions included with Boiler.

Table 10 -

Gas Supply Pressure

CAUTION

WHAT TO DO IF YOU SMELL GAS

• Do not try to light any appliance.
• Do not touch any electrical switch; do not use

any phone in your building.

• Immediately call your gas supplier from a

neighbor’s phone. Follow gas supplier’s

instructions.

• If you cannot reach your gas supplier, call the fire

department.

!

Gas Supply Pressure

MODEL

Natural Gas

Propane

Min.

Max.

Min.

Max.

050

3.0" w.c.

(0.7 kPa)

13.5" w.c.

(3.3 kPa)

5.0" w.c.

(1.2 kPa)

13.5" w.c.

(3.4 kPa)

075

100

150

200

299

FIGURE 7-1 Gas Connection

Note: See Glossary - Piping Table 16

NOTICE

Use two (2) wrenches when tightening and fitting

to pipe boiler's threaded fittings. Boiler's internal

piping can be damaged if subjected to excessive

torque.

Gas Connection

7 - GAS SUPPLY PIPING