MovinCool Office Pro 63 Service Manual User Manual

Page 69

Advertising
background image

Repair Section

69

(3) Checking vacuum

1) Leave the high pressure valve and the low

pressure valve of the gauge manifold closed for

five min or more, and confirm that the gauge

pointer does not return to zero.

2) If the gauge pointer returns gradually to zero

there is a leak somewhere in the system (this

could also include gauge manifold). Perform leak

check according to procedure indicated in the

next step. Once leak has been found and

repaired evacuate the system once more, and

confirm system holds vacuum.

I002184

Return

Pipe Brazing

Leave valves closed for 5
min or more. Pointer of
pressure gauge returning to
zero indicates there is a leak.

LO

Closed

HI

Closed

Valve Setting

Pressure Gauge

Advertising