2.3.2 Hot Tap Guidelines

!

WARNING

Hot tapping must be performed by a trained professional. US regulations often require a hot tap

permit. The manufacturer of the hot tap equipment and/or the contractor performing the hot tap is

responsible for providing proof of such a permit.

Refer to a standard code for all pipe tapping operations. The following tapping instructions
are general in nature and intended as a guideline only.
1. Confirm that the installation site meets the minimum upstream and downstream pipe

diameter requirements.

2. Weld a 2" mounting adapter on the pipe. Make sure the mounting adapter is within ± 5°

perpendicular to the pipe centerline (see previous page). The pipe opening must be at least
1.875" in diameter.

3. Connect a 2" process connection on the mounting adapter.
4. Connect an isolation valve on the process connection. The valve’s full open bore must be

at least 1.875" in diameter.

5. Run a static pressure check on the welds. If pressure loss or leaks are detected, repair the

joint and re-test.

6. Connect the hot tapping equipment to the isolation valve, open the isolation valve and

drill at least a 1.875" diameter hole.

7. Retract the drill, close the isolation valve, and remove the hot tapping equipment.
8. Connect the flow meter to the isolation valve and open the isolation valve.
9. Calculate the sensor probe insertion depth and insert the sensor probe into the pipe as

described on the following pages.

!

WARNING

All flow meter connections, isolation valves, and fittings for hot tapping must have the same or

higher pressure rating as the main pipeline.

FLOW

xxxxxxxxxxxxxxxxxxxx

xxxxxxxxxxxxxxxxxxxx

xxxxxxxxxxxxxxxxxxxx

xxxxxxxxxxxxxxxxxxxx

Check upstream and downstream

piping requirements

Weld mounting adapter

Connect process connection

(flange or NPT)

Connect isolation valve and

test for leaks

Hot tap pipe

Purge pipe

Connect meter to valve, calculate

insertion depth, install flow meter

Figure 9. Hot Tap Sequence

Advertising