§ 6.3.A Modifying Tasks within the Schedule

Once you have added your tasks to the schedule, you are ready to modify the tasks properties!

While in the ‘Schedule Properties’ dialog, double-click the task you wish to modify from the
‘Scheduled Tasks’ section. This brings up the ‘Schedule Task Properties’ dialog. From here
you are given several options:

a. Operation on end of task

· Run next task in schedule: This option will run the next task that you’ve added to the schedule

once the

task has ended.
· Restart current task: This will restart the current task once it has finished. Use this selection to

loop your task indefinitely.

· Wait for end of task period and then start next task in schedule: Use this Selection if you’ve set a

specific duration for the task.

b. Duration: Lets you configure how long you would like the task to be displayed on your

screen. Setting this to 0:0:0 will automatically stop the task once it has ended. This is
primarily used for video and flash movies.
c. Window: Lets you configure whether you want your task to be displayed actual size,
maximized, minimized, or hidden. (figure 6.3.4)
d. Use View: If you are using templates*, this control lets you select which view to display
your task. (figure 6.3.5)
e. Click ‘OK’ to save your settings.

figure 6.3.3

figure 6.3.4

figure 6.3.5

5. Day and Time: Use the ‘Day and Time’ tab to control when and for how long the schedule
will play. The Day and Time dialog controls the following;