B run schedule after a power failure – Smart Avi SignagePro User Manual

Page 42

Advertising
background image

SmartAVI SignagePro Manual

38

(c) 2010 SmartAVI

figure 6.3.7

§ 6.3.B Run Schedule after a power failure

If you need a schedule to start by itself even if you disconnect the SignagePro Player from a
network and re-plug the power, you will need to follow those steps:

a) We will need to have SignagePro Player to be connected to the network so the server would
see it and that would allow us to apply new settings.

First, open SignagePro Manager software and go to the Task Manager, where you will need to
create a schedule or modify existing one. (figure 1)

Advertising