E line in a task – Smart Avi SignagePro User Manual

Page 68

Advertising
background image

SmartAVI SignagePro Manual

64

(c) 2010 SmartAVI

figure 6.6.11

You also have the ability to adjust the height and width of your textbox as well. (figure
6.6.11)

Note: You can preview your changes anytime by clicking the ‘Preview’ button.

§ 6.6.E Line in a Task

The new Creeping Line Manager allows SignagePro users to add multiple Creeping Lines in a
Task rather than in a Schedule. You can now add multi Creeping Lines into specific Tasks.

To add Creeping Lines into a Task:

1. Click on the Task Properties of the Task you want to add the Creeping Line into.

figure 6.6.13

2. Click on the button that is labeled 'Creeping Line Manager' (figure 6.6.13)

Advertising
This manual is related to the following products: