Fujimoto Fuji Differential Pressure Transmitter FKK 4 User Manual

Page 51

Advertising
background image

45

Hold the hexagonal area of the vent/drain plug
with a wrench and remove it by turning slowly.
Peel the existing seal tape and wind a new seal
type. Then, screw the vent/drain plug into the
process connection for changing.

Tightening torque: 25N•m (2.5kgf•m) <18ft-lb>

Ensure a space of about 500mm against the cover in order to facilitate check, adjustment, etc.

500

500

500

Process connection

Change of vent/drain plug position

Check space