1 replacing the front panel indicators, 1 required tools, 2 preliminary steps – FUJITSU PRIMERGY MX130 S2 User Manual
Page 224: Replacing the front panel indicators, Required tools, Preliminary steps
Advertising

224
Upgrade and Maintenance Manual
MX130
S2
Front panel and front USB
13.1 Replacing the front panel indicators
The On/Off button and the HDD activity LED are part of the front panel module.
13.1.1 Required tools
●
Preliminary and concluding steps: tool-less
●
Replacing the front panel module: tool-less
13.1.2 Preliminary steps
Ê
Follow all procedures described in section
"Opening the server" on page 48
.
Ê
Open the front cage as described in section
Field Replaceable Units (FRU)
Average task duration: 15 minutes
Advertising