1 replacing the front panel indicators, 1 required tools, 2 preliminary steps – FUJITSU PRIMERGY MX130 S2 User Manual

Page 224: Replacing the front panel indicators, Required tools, Preliminary steps

Advertising
background image

224

Upgrade and Maintenance Manual

MX130

S2

Front panel and front USB

13.1 Replacing the front panel indicators

The On/Off button and the HDD activity LED are part of the front panel module.

13.1.1 Required tools

Preliminary and concluding steps: tool-less

Replacing the front panel module: tool-less

13.1.2 Preliminary steps

Ê

Follow all procedures described in section

"Opening the server" on page 48

.

Ê

Open the front cage as described in section

"Opening the front cage" on

page 52

.

Field Replaceable Units (FRU)

Average task duration: 15 minutes

Advertising