4 concluding steps, 1 required tools, 2 preliminary steps – FUJITSU PRIMERGY MX130 S2 User Manual

Page 91: Concluding steps, Required tools, Preliminary steps

Advertising
background image

MX130 S2

Upgrade and Maintenance Manual

91

HDDs and accessible drives

7.4.4

Concluding steps

Perform the following procedures to complete the task:

Ê

Close the front cage as described in section

"Closing the front cage" on

page 53

.

Ê

Follow all procedures described in section

"Closing the server" on page 54

.

7.5

Installing additional 3.5-inch HDD in 3.5-
inch chassis bay

7.5.1

Required tools

Preliminary and concluding steps: tool-less

Installing a 3.5-inch HDD

– Phillips PH2 / (+) No. 2 screw driver

7.5.2

Preliminary steps

Before installing a 3.5-inch HDD, perform the following steps:

Ê

Follow all procedures described in section

"Opening the server" on page 48

.

Ê

Open the front cage as described in section

"Opening the front cage" on

page 52

.

Ê

Locate the correct drive bay as described in section

"Mounting order" on

page 82

.

Upgrade and Repair Units (URU)

Average task duration: 5 minutes

Advertising