10.2 INPUT TRANSFORMER CUBICLE

10.2.1 Introduction

The Input Transformer Cubicle is placed in the Input supply path of the UPS . It

consist of Star - Star OR Delta - Star transformer of rated capacity to provide

Isolation from the Input Distribution supply to the UPS input.. The Cubicle also
consist of Battery Breaker with its Battery Trip PCB of the respective UPS.

10.2.2 Termination

The Incoming Supply from the Customers distribution is fed as input to the Input

Transformer Cubicle. The incoming supply 3ph,4wire is fed to RI ,SI,TI,NI terminals .

The Battery Breaker input from the UPS is fed to +R1 , -R1. The output of the

Transformer cubicle is available on the RU,SU,TU,NU terminals , the Battery Breaker

output is fed to BATTERIES through terminals +B ,-B terminals

10.2.3 Indication & Metering

LED’s are used to monitor availability of Input voltage before the Isolation Transformer
and after the Transformer which are seen on the Mimic Panel.

Incoming L-L voltage and Phase current is measured using Voltmeter & Current meter

which are seen on the Mimic Panel , A selector switch S1 is used to select RY ,YB, BR
Voltage and R,Y,B Phase currents

10.2.4 Protection

Incoming 3 pole MCCB is used as Protective Device before the Isolation

transformer, Control fuses are used for protection of Voltmeter and Fans Cubicle
Battery path MCCB is used as Protective Device in Battery path


Utility socket is provide for single phase supply