5.2

Procedure for UPS Start-up: without interrupting power

to the load

This procedure will describe

how to start the UPS and the
how to transfer the load from

the external maintenance

bypass to the UPS inverter. It is
assumed that the installation is

complete, the system has been

commissioned by authorized
personnel and the external

power isolators are closed.

Refer to Fig 5-1 for
corresponding isolators Q1 to

Q4, and Fig 5-2 Operator

Control Panel for various LEDs
and Display indications.






















ENSURE CORRECT PHASE ROTATION

1. Close Q3 Maintenance Bypass switch and

external switch (inside Maintenance Bypass) to
load.

2. Close the output power switch Q4 and the
Bypass power switch Q2.


Initializing Window:

After first connecting power to the UPS and closing
the isolator, this message will appear on the LCD
screen. It persists for about five seconds while the
control firmware is loaded by a screen showing
various messages with the time and date on the
bottom line.


The Module Mimic indicators Bypass supply
healthy (1) and after 20 seconds Load on Bypass
(6) will flash and red led (13) will illuminate.

ESC

MENU

ENTER

INV

%

DISPLAY

1

2

3

7

8

9

10

11

12

13

14

15

16

17

18

19

4

5

6

Fig 5 - 2: Operator Control Panel

Fig 5 - 1: Location of Power Isolators

EMERSON NETWORK POWER

3PH-1PH

UPS

EMERSON NETWORK POWER

3PH-1PH

UPS

Q3

Q1

Q2

Q4

Bypass
Isolator

Maint.
Bypass

Output
Isolator

Input
Supply

Advertising