4 preliminary checks, 5 installation drawings – Liebert 130 kVA User Manual

Page 30

Advertising
background image

User Manual

Hipulse - Single Phase ‘1+N’ UPS System

130 kVA - 110V

10


2.4

Preliminary Checks

Before you install the UPS hardware you should carry out the following preliminary

checks:

1. Verify that the UPS room satisfies the environmental conditions stipulated in the

equipment specification, paying particular attention to the ambient temperature and
air exchange system.

2. Remove any packaging debris, then visually examine the UPS and battery
equipment for transit damage, both internally and externally. Report any such

damage to the shipper immediately.






2.5

Installation Drawings

The following diagrams illustrate the key mechanical characteristics of the various
UPS system cabinets

Fig 2-1: Overall General Arrangement for 130 kVA Single Phase 110V UPS with 6 Pulse
rectifier Single Module and ‘1+N’

Fig 2-2: Cable entry and Foundation details for 130 kVA Single Phase 110V UPS with 6
Pulse rectifier Single Module and ‘1+N’.

Advertising