Refrigerant cycle diagram, 1. refrigerant cycle diagram – Toshiba RAS-10SKV-A User Manual

Page 21

Advertising
background image

– 20 –

7. REFRIGERANT CYCLE DIAGRAM

7-1. Refrigerant Cycle Diagram

RAS-10SKV-E / RAS-10SAV-E

NOTE :

• The maximum pipe length of this air conditioner is 10 m. The addition charging of refrigevant is

Deoxidized copper pipe
Outer dia. : 9.52mm
Thickness : 0.8mm

NOTE :

Gas leak check position
Refrigerant flow (Cooling)
Refrigerant flow (Heating)

INDOOR UNIT

T1

TO

Temp. measurement

TC

TA

Indoor heat

exchanger

Cross flow fan

Deoxidized copper pipe
Outer dia. : 6.35mm
Thickness : 0.8mm

Sectional shape
of heat insulator

Allo

w

ab

le height

diff

erence :

10m

Allo

w

ab

le pipe length

P

Pressure measurement
Gauge attaching port
Vacuum pump connecting port

TD

4-way valve
(STF-0108Z)

Compressor
DA89X1C-23FZ

T2

Outdoor heat

exchanger

Temp. measurement

Propeller fan Refrigerant amount : 0.63kg

OUTDOOR UNIT

Muffler

Muffler

Ø1.0 x 600

T E

Ø1.0 x 600

Min. : 1m
Chargeless : 10m

RAS-10SKV-A / RAS-10SAV-A

Max. : 10m

unnecessary because this air condition is design with charge-less specitication.

FILE NO. SVM-07008

Advertising
This manual is related to the following products: