-3-3. Evacuating

After the piping has been connected to the indoor unit,

you can perform the air purge together at once.

AIR PURGE

Evacuate the air in the connecting pipes and in the

indoor unit using a vacuum pump. Do not use the

refrigerant in the outdoor unit. For details, see the

manual of the vacuum pump.

<Using a vacuum pump>
Be sure to use a vacuum pump with counter-flow

prevention function so that inside oil of the pump does

not flow backward into pipes of the air conditioner

when the pump stops. (If oil inside of the vacuum pump

enters into the air conditioner, which use R410A,

refrigeration cycle trouble may result.)

1. Connect the charge hose from the manifold valve to

the service port of the gas side packed valve.

2. Connect the charge hose to the port of the vacuum

pump.

3. Open fully the low pressure side handle of the

gauge manifold valve.

4. Operate the vacuum pump to start evacuating.

Perform evacuating for about 15 minutes if the

piping length is 20 meters. (15 minutes for

20 meters) (assuming a pump capacity of 27 liters

per minute. Then confirm that the compound

pressure gauge reading is − 101 kPa (76 cmHg).

5. Close the low pressure side valve handle of gauge

manifold.

6. Open fully the valve stem of the packed valves

(both side of Gas and Liquid).

7. Remove the charging hose from the service port.

8. Securely tighten the caps on the packed valves.

Fig.10-3-7

Tightening torque of flare pipe connections

The operating pressure of R410A is higher than that of

R22. (Approx. 1.6 times).

It is therefore necessary to firmly tighten the flare pipe

connecting sections (which connect the indoor and

outdoor units) up to the specified tightening torque.

Incorrect connections may cause not only a gas

leakage, but also damage to the refrigerant cycle.

Fig. 10-3-5

<Shaping pipes>
1. How to shape the pipes

Shape the pipes along the incused line on the

outdoor unit.

2. How to fit position of the pipes

Put the edges of the pipes to the place with a

distance of 85 mm from the incused line.

Fig. 10-3-6

(Unit : Nám)

Outer dia.

Tightening torque

of copper pipe

∅6.35 mm

16 to 18 (1.6 to 1.8 kgf·m)

9.52 mm

30 to 42 (3.0 to 4.2 kgf·m)

Flare at

indoor unit side

Flare at

outdoor unit side

Incused line

85

m

m

CAUTION

KEEP IMPORTANT 4 POINTS FOR PIPING
WORK

(1) Take away dust and moisture (Inside of the

connecting pipes.)

(2) Tight connection (between pipes and unit)
(3) Evacuate the air in the connecting pipes using

VACUUM PUMP.

(4) Check gas leak (connected points)

Pressure gauge

Manifold valve

–101 kPa (76 cmHg)

Handle Lo

Connecting pipe

Compound pressure gauge

Vacuum

pump

Handle Hi (Keep full closed)

Charge hose (For R410A only)

Vacuum pump adapter for
counter-flow prevention
(For R410A only)

Service port (Valve core (Setting pin))

Packed valve at liquid side

Packed valve at gas side

Charge hose (For R410A only)