Trains, Clips, Go to in/out and sync all t/c – EVS IPDirector Version 4.4 - March 2008 Part 3 User's Manual User Manual

Page 71: Ransport, Ommand, Ynchronization, Anged, Layer, Hannels

Advertising
background image

Issue 4.4.C

IP Director Version 4.4 – User Manual – Part 3: Ingest and Play-Out

EVS Broadcast Equipment – March 2008

58

4.10.2 T

RANSPORT

C

OMMAND

S

YNCHRONIZATION

O

N

G

ANGED

P

LAYER

C

HANNELS

T

RAINS

When live or stopped record trains are loaded on ganged player channels, the
NEXT and PREVIOUS commands executed on one PGM by means of the
ShuttlePRO are only applied on this PGM:

If the train belongs to a group of ganged recorders, the application shifts to the

next or previous record train of the group.

If the train does not belong to a group of ganged recorders, the application

shifts to the next or previous record train of the SDTI network.

Trains A,B,C

belonging

to a group of

ganged recorders

or to the netw

ork

C

LIPS

GO TO IN/OUT and SYNC ALL T/C

When linked or non linked clips are loaded on ganged player channels, the GO TO
IN
, GO TO OUT and the SYNC ALL T/C are applied to all clips loaded on the
ganged player channels.

With the SYNC ALL T/C command, all clips on ganged channels are loaded on the
same TC as the clip loaded on the main channel. The main channel is the channel

where the command is applied.

Advertising