Inside ladder installation, Chapter 4 inside ladder installation, 66" corrugated farm bin – Grain Systems Bin Accessories PNEG-1802 User Manual

Page 12: Inside ladder installation (without stir-ator)

Advertising
background image

12

PNEG-1802 Inside Ladder Instructions

4. Inside Ladder Installation

2.66" Corrugated Farm Bin

Inside Ladder Installation (without Stir-Ator)

Inside Ladder Placement

The inside ladder package includes the ladders, starter brackets and double the amount of standoff
brackets. Begin by positioning the ladder directly under the manhole roof panel as shown in

Figure 4A

and install the starter brackets as shown in

Figure 4B on Page 13

. Place the standoff brackets every

16" vertically on the sidewall sheets using the horizontal seam holes for every other hole location. Use
5/16" x 3/4" bin bolts to attach the standoff brackets to the sidewall of the grain bin.

NOTE: Refer to general detail information section on PNEG-1420 for additional details for standoff bracket

to ladder assembly.

Figure 4A

Advertising