Grain Systems Bin Accessories PNEG-1802 User Manual
Page 37
4. Inside Ladder Installation
PNEG-1802 Inside Ladder Instructions
37
Inside Starter Bracket and Ladder Placement
Refer to
and follow the correct dimensions as shown. The ladder starter brackets must be
located in line with the horizontal seam. Check the 4' ladder section to make sure the ladder rung
dimples are to the top. Attach to the starter brackets using the hole located 1" from top of the ladder. It will
be necessary to field drill the second 3/8" hole for the starter bracket on the ladder 2" below the hole
1" from the top of the ladder. All standoff brackets must be installed every 16" and attached to each
4' section required.
NOTE: Refer to general detail information section on PNEG-1451 for additional details for standoff bracket
to ladder assembly.
Figure 4AF