66" corrugated commercial hopper tank 10-22 rings – Grain Systems Bin Accessories PNEG-1802 User Manual

Page 39

Advertising
background image

4. Inside Ladder Installation

PNEG-1802 Inside Ladder Instructions

39

2.66" Corrugated Commercial Hopper Tank 10-22 Rings

Inside Ladder Placement

The inside ladder package includes the ladder, starter brackets and double the amount of standoff
brackets. Position the ladder directly under the manhole roof panel as shown in

Figure 4AI

and install the

starter brackets as shown in

Figure 4AJ on Page 40

. Place the standoff brackets vertically on the sidewall

sheets every 16" using the horizontal seam holes for every other hole location. Use 5/16" x 3/4" bin bolts
to attach the standoff brackets to the sidewall of the grain bin.

Figure 4AI

Advertising