66" corrugated commercial hopper tank 4-9 rings – Grain Systems Bin Accessories PNEG-1802 User Manual

Page 36

Advertising
background image

4. Inside Ladder Installation

36

PNEG-1802 Inside Ladder Instructions

2.66" Corrugated Commercial Hopper Tank 4-9 Rings

Inside Ladder Location

The inside ladder package includes the ladder, starter brackets and double the amount of standoff
brackets. Position the ladder directly under the manhole roof panel as shown in

Figure 4AE

and install the

starter brackets as shown in

Figure 4AF on Page 37

. Place the standoff brackets every 16" vertically on

the sidewall sheets using the horizontal seam holes for every other hole location. Use 5/16" x 3/4" bin bolts
to attach the standoff brackets to the sidewall of the grain bin.

Figure 4AE

Advertising