4. Inside Ladder Installation

PNEG-1802 Inside Ladder Instructions

45

4.00" Corrugation Farm Commercial Hopper Tank (FCHT) 7-9 Rings

Inside Ladder Installation

The inside ladder package includes the ladders, starter brackets and double the amount of standoff
brackets. Position the ladder directly under the manhole roof panel as shown in

Figure 4AQ

and install

starter brackets as shown in

Figure 4AR on Page 46

. Place the standoff brackets every 22" vertically on

the sidewall sheets using the horizontal seam holes for every other hole location. Use 5/16" x 3/4" bin bolts
to attach the standoff brackets to the sidewall of the grain bin.

Figure 4AQ