Grain Systems Bin Accessories PNEG-1802 User Manual
Page 45
Advertising
4. Inside Ladder Installation
PNEG-1802 Inside Ladder Instructions
45
4.00" Corrugation Farm Commercial Hopper Tank (FCHT) 7-9 Rings
Inside Ladder Installation
The inside ladder package includes the ladders, starter brackets and double the amount of standoff
brackets. Position the ladder directly under the manhole roof panel as shown in
and install
starter brackets as shown in
. Place the standoff brackets every 22" vertically on
the sidewall sheets using the horizontal seam holes for every other hole location. Use 5/16" x 3/4" bin bolts
to attach the standoff brackets to the sidewall of the grain bin.
Figure 4AQ
Advertising