Grain Systems Bin Accessories PNEG-1802 User Manual
Page 42
Advertising
4. Inside Ladder Installation
42
PNEG-1802 Inside Ladder Instructions
4.00" Corrugation Farm Commercial Hopper Tank (FCHT) 4-6 Rings
Inside Ladder Installation
The inside ladder package includes the ladders, starter brackets and double the amount of standoff
brackets. Position the ladder directly under the manhole roof panel as shown in
starter brackets as shown in
. Place the standoff brackets vertically on the sidewall
sheets every 22" using the horizontal seam holes for every other hole location. Use 5/16" x 3/4" bin bolts
to attach the standoff brackets to the sidewall of the grain bin.
Figure 4AM
Advertising