Grain Systems Bin Accessories PNEG-1802 User Manual

Page 42

Advertising
background image

4. Inside Ladder Installation

42

PNEG-1802 Inside Ladder Instructions

4.00" Corrugation Farm Commercial Hopper Tank (FCHT) 4-6 Rings

Inside Ladder Installation

The inside ladder package includes the ladders, starter brackets and double the amount of standoff
brackets. Position the ladder directly under the manhole roof panel as shown in

Figure 4AM

and install

starter brackets as shown in

Figure 4AN on Page 43

. Place the standoff brackets vertically on the sidewall

sheets every 22" using the horizontal seam holes for every other hole location. Use 5/16" x 3/4" bin bolts
to attach the standoff brackets to the sidewall of the grain bin.

Figure 4AM

Advertising