00" corrugated farm bin, Inside ladder installation (without stir-ator) – Grain Systems Bin Accessories PNEG-1802 User Manual

Page 24

Advertising
background image

4. Inside Ladder Installation

24

PNEG-1802 Inside Ladder Instructions

4.00" Corrugated Farm Bin

Inside Ladder Installation (without Stir-Ator)

Inside Ladder Placement

The inside ladder package includes the ladders, starter brackets and double the amount of standoff
brackets. Begin by positioning the ladder directly under the manhole roof panel as shown in

Figure 4Q

and

install starter brackets as shown in

Figure 4R on Page 25

. Place the standoff brackets every 22" vertically

on the sidewall sheets using the horizontal seam holes for every other hole location. Use 5/16" x 3/4"
bin bolts to attach the standoff brackets to the sidewall of the grain bin.

Figure 4Q

Advertising