00" corrugated farm bin, Inside ladder installation (without stir-ator) – Grain Systems Bin Accessories PNEG-1802 User Manual
Page 24
Advertising
![background image](/manuals/277561/24/background.png)
4. Inside Ladder Installation
24
PNEG-1802 Inside Ladder Instructions
4.00" Corrugated Farm Bin
Inside Ladder Installation (without Stir-Ator)
Inside Ladder Placement
The inside ladder package includes the ladders, starter brackets and double the amount of standoff
brackets. Begin by positioning the ladder directly under the manhole roof panel as shown in
install starter brackets as shown in
. Place the standoff brackets every 22" vertically
on the sidewall sheets using the horizontal seam holes for every other hole location. Use 5/16" x 3/4"
bin bolts to attach the standoff brackets to the sidewall of the grain bin.
Figure 4Q
Advertising