OUTPUT FREQ BAT IN

90V 3.5A 60Hz 12V 120

4.0 Operation

4.1 Start-up and Test

4.1.1 AC Line Operation

Before making power supply connections, verify the correct voltage, polarity and

1.

frequency are available from both the AC utility power source and the DC battery

system.

Verify the AC circuit breaker (on the customer supplied service disconnect) and

2.

the battery switch on the XM2-300HP are off.

Plug the XM2-300HP power cord into the convenience outlet and connect the

3.

battery cable to the CableUPS. Plug the RTS into the temp probe connection

and attach it to the negative terminal of the battery. Refer to Fig. 1-8. Plug the

LRI cables into the front panel, if applicable.

Switch the AC (service disconnect) circuit breaker on to start initial power

4.

up. During this stage the power supply performs a “display test” and verifies

configuration for the power supply. After the initial display test, a “No Batteries”

alarm message appears in the Smart Display because the battery switch is off.

The green output LED remains off and the red alarm LEDcontinues to flash

while in this alarm state (see Section 4.5).

Access the configuration screen any time by simultaneously pressing UP and ENTER.