Data number 20, 21, 22, 30~33, 40, 50, 41 & 42 – FEC DSP1500 (SAN3) User Manual

Page 104

Advertising
background image

PAGE 6-42


enFORCE

Operation Manual


¾

Data Number 20 - Low Distance Limit

¾

Data Number 21 - High Distance Limit

ƒ

Minimum and maximum acceptable limits for [22: Standard Distance].

In Load Control, if [21: High Distance Limit] is reached before achieving [13: Standard
Load]
, the press will stop.

¾

Data Number 22 - Standard Distance

ƒ

In Distance Control Methods, this is the target distance value.

(Example: If Standard Distance is 100mm, press will attempt to operate until 100mm is
reached.)

¾

Data Number 30 - Rate 1 Low

¾

Data Number 31 - Rate 1 High

ƒ

Minimum and maximum acceptable limits of the slant of load and distance between

Threshold and 1

ST

Distance or 1

ST

Load.

Judgment will take place when 1

ST

Distance or 1

ST

Load is reached.

ƒ

When Parameter 00, D-No. 0A (Option Setting) is set to a number other than zero, these

settings control the “On” and “Off” the Timing Signal while the press is advancing.

¾

Data Number 32 - Rate 2 Low

¾

Data Number 33 - Rate 2 High

ƒ

Minimum and maximum acceptable limits of the slant of load and distance between

Crossover Distance or Crossover Load and Standard Distance or Standard Load.

Judgment will take place when Standard Distance or Standard Load is reached.

ƒ

When Parameter 00, D-No. 0A (Option Setting) is set to a number other than zero, these

settings control the “On” and “Off” the Timing Signal while the press is returning.

Load Rate Value Setting Limit for Different Tools

Tool Name

Load Rate

Maximum Value

F-Type

Load Rate

Maximum Value

P-Type

DPT-021**-**

5.000

5.000

DPT-051**-**

5.000

50.00

DPT-101**-**

50.00

50.00

DPT-151**-**

50.00

50.00

DPT-201**-**

50.00

50.00

DPT-301**-**

50.00

50.00

DPT-501**-**

50.00

50.00

DPT-701**-**

50.00

DPT-102**-**

50.00

50.00

DPT-202**-**

50.00

50.00

¾

Data Number 40 - Initial Time

¾

Data Number 50 - Initial Speed

ƒ

Ramp up speed and time value at start of cycle.

Initial speed is performed during initial time.

¾

Data Number 41 - 1

ST

Time High Limit

ƒ

Maximum time allowed to reach 1

ST

Load from start of cycle.

Operation will stop if this time is exceeded.

¾

Data Number 42 - 2

ND

Time High Limit

ƒ

Maximum time allowed to reach Standard Distance or Standard Load from 1

ST

Load.

Operation will stop if this time is exceeded

Chapter 6: System Operation

UNIT:KN/mm

Advertising