Distance control (method 1), Enforce – FEC DSP1500 (SAN3) User Manual

Page 89

Advertising
background image

PAGE 6-27

enFORCE

Operation Manual

Distance Control (Method 1)

Upon start of cycle, the press will operate until it achieves [22: Standard Distance].
During the press cycle, checks are performed for “1

ST

Judgment Zone”, 1

ST

Rate, 2

ND

Rate, Load, Distance, 1

ST

Time and 2

ND

Time. If any of these values are compromised,

the press will stop and return as programmed.
(See corresponding sections for Time, Rate, 1

ST

Zone and Speed explanations.)




ƒ

If “1

ST

Judgment Zone” is not used, set [15: 1

ST

Load] to [10: CAL Load] and

[23: 1

ST

Distance] to a minimum of [21: High Distance].

ƒ

Review Speed Section explanations and cautions when setting [15: 1

ST

Load],

[14: Speed Change Load], [24: Crossover Distance] and [20: Freerun
Distance]
.

ƒ

If 1

ST

Rate or 2

ND

Rate are not used, set judgment windows wide open; low value

of 0 and maximum high value. Also, if 1

ST

H/L Check is not being used, set

[17: Threshold Load] to [10: CAL Load].








Load

Distance

[12]

High

Load Limit

[16] Snug Load

[11] Low Load Limit

[15] 1

ST

Load

[14] Speed Change Load

[17] Threshold Load

[20]

Low

Distance

[21]

High

Distance

2

ND

Rate

[41]

1

ST

Time

[42]

2

ND

Time

1

ST

Rate

[23]

1

ST

Distance

1ST Judgment Zone

Final Judgment Zone

Chapter 6: System Operation

[22]

Standard

Distance

[24]
Crossover

Distance

Advertising