3.3.2. Timing a CLOSE-OPEN Operation Using Contact Channel #1

The CLOSE-OPEN operation of a breaker simulates a condition where a breaker is closed on a
fault. There are three options when timing a CLOSE-OPEN operation:

1. Contact #1 CLOSE

The CT-8000 will initiate a CLOSE operation. The open operation is then initiated after
contact channel #1 is closed. This option closes simulates the breaker closing on a fault
condition in the field.

2. Set DELAY

A delay from 10 to 500 ms can be set between the CLOSE command and the OPEN
command. The CT-8000 will initiate the CLOSE operation and start the delay counter.
The OPEN operation will be initiated when the delay time has elapsed.

3. No DELAY

Both the CLOSE and OPEN commands are initiated by the CT-8000 simultaneously. The
OPEN coil is energized when the OPEN auxiliary switch makes.

Follow the steps below to time a CLOSE-OPEN operation:

a. Start from the “START-UP” menu:

Press the

[1]

key (RUN TEST).

b. The following screen will be displayed:

Press the

[1]

key (TIME BREAKER).

c. The following screen will be displayed:

Press the

[1]

key (NO).

INSERTION RESISTOR?

1. NO

2. YES

1. TIME BREAKER

2. STATIC RES TEST

3. DYNAMIC RES TEST

1. RUN TEST 03/10/10

2. GET RSLT 09:04:05

3. SETUP

4. DIAGNOSTICS