System requirements, Preparing for the upgrade – Lincoln Electric IM8001 PRODUCTION MONITORING 2.2 User Manual

Page 22

Advertising
background image

IM8001

Production Monitoring™ User Manual

2.1

Chapter 2

Upgrading from Production Monitoring™ 2.1

If you already have Production Monitoring™ 2.1 installed and simply need to upgrade to version 2.2, this
section provides simple information for you to accomplish this as quickly as possible.

STOP |

If you have Production Monitoring™ 2.0 or lower (or you

need to install for the first time), you must refer to Chapter
3 for instructions. Upgrading to the new version requires
that you uninstall all older versions and install the new
version fresh.

System Requirements

The system must meet the requirements listed on page 1.4 to install and run the Production Monitoring™
2.2 application. If one of these requirements is missing, the installation will fail. For assistance with these
requirements, please contact your local IT department or contact support at

[email protected]

.

Preparing for the Upgrade

To upgrade from Production Monitoring™ 2.1 to Production Monitoring™ 2.2, you will need the following:

ƒ Administrator permissions on your server computer.

ƒ Production Monitoring™ 2.2 Patch

If you do not have the Production Monitoring™ 2.2 Patch, contact Production Monitoring™
support at

[email protected]

for assistance with obtaining the

software.

ƒ A standard installation of Production Monitoring™ 2.1 running on the server computer.

STOP |

If your Production Monitoring™ 2.1 installation is non-

standard, you will need to contact support for assistance
with the upgrade process.

A non-standard installation would include any installation
where the Production Monitoring™ database has been
moved to a different server or the password for the
Production Monitoring™ database has been changed within
Microsoft® SQL Enterprise Manager.

Advertising