Getting the team started – Lincoln Electric IM8001 PRODUCTION MONITORING 2.2 User Manual
Page 66
![background image](/manuals/363607/66/background.png)
Getting the Team Started
Chapter 4. Production Monitoring™ Administration
IM8001
Production Monitoring™ User Manual
4.19
Figure 4.16 Global Unit of Measure
Getting the Team Started
Congratulations! You have completed all the setup necessary to get your team using Production
Monitoring™. Now it’s time to share the link to the Production Monitoring™ web site. The system makes
this simple for you.
Figure 4.17 Provide Access to Production Monitoring™
To generate a link to the main page of the Production Monitoring™ application:
Procedure
Details
1.
Launch Production Monitoring™ on the server
computer.
See Figure 4.17.
2.
At the bottom of the screen, click the E-mail a
Link to this Site link.
This should open the default e-mail client program
on the server computer.
3.
In
the
To field, enter the e-mail address(es) of
the person (or people) who will be monitoring
and running reports from Production
Monitoring™.
4.
Send the e-mail.