Lincoln Electric IM8001 PRODUCTION MONITORING 2.2 User Manual

Page 54

Advertising
background image

Managing the Asset Tree

Chapter 4. Production Monitoring™ Administration

IM8001

Production Monitoring™ User Manual

4.7

Procedure

Details

5.

Click on the Select button next to the

Configuration Import field and select the
installation key file that you created in step 1.

The installation key file ends in TOK
(e.g., 10.23.10.90.tok).

6.

Click Run Import.

The system places a check mark in the Enable Data
Collection on Welder
checkbox for you and displays
a list of attributes for the Welding Power Source
next to Configuration.

You can use information from the Description to
name your power source in the Asset Tree if you
choose.

7.

Enter the name of the Welding Power Source

in the Name field under Asset Properties and
click Save Changes.

Congratulations! You have added a Welding
Power Source entry to the Asset Tree in
Production Monitoring™.

8.

Repeat steps 1 through 7 for each power

source you want to add to the Asset Tree.

Advertising