Chapter 4. Production Monitoring™ Administration
Managing the Asset Tree
4.6
Production Monitoring™ User Manual
IM8001
In order to connect a Welding Power Source to Production Monitoring™, you need to save an installation
key file for each power source using the Power Wave® Manager. Refer to the Power Wave® Manager User
Manual for more details.
To add a Welding Power Source to Production Monitoring™:
Procedure
Details
1.
Save an installation key file with the Power
Wave® Manager.
Refer to the Power Wave® Manger User Manual
under Saving an Installation Key File.
2.
Click on the Group to which you want to add
the Welding Power Source.
For example, John at Advanced Manufacturing
wants to add a welder to Line 1.
3.
Click Add A New Asset at the top of the
Asset Tree.
A New Asset appears under the selected Group
and the Asset Properties section displays.
4.
Select
Welder from the Tree Node Type
drop-down.
The new Asset Configuration section appears
under the Asset Properties.