Installing a new link – JLG E300 Service Manual User Manual

Page 116

Advertising
background image

SECTION 4 - BOOM & PLATFORM

4-18

– JLG Lift –

3121253

7. Remove the link from the other section of the pow-

ertrack using a screwdriver.

Installing a New Link

1. Squeeze the peanut cut out end of the new link into

the half-shear (female) end of the track section.

Advertising