3 pressure setting procedure, Adjustments made at the main valve bank, Pressure setting procedure -14 – JLG E300 Service Manual User Manual

Page 156: Adjustments made at the main valve bank -14

Advertising
background image

SECTION 5 - HYDRAULICS

5-14

– JLG Lift –

3121253

5.3 PRESSURE SETTING PROCEDURE

Adjustments made at the Main Valve Bank

MAIN PRESSURE RELIEF VALVE – 3000 PSI (207
BAR)

1. Install pressure gauge at port MP of Main Valve

Bank.

2. Actuate and hold Telescope In to “end of stroke” &

take pressure reading.

3. After loosening relief valve jam nut, adjust valve

clockwise to increase setting or counter-clockwise to
reduce the setting accordingly.

4. Tighten relief valve jam nut and repeat step 2 to ver-

ify setting.

SWING RIGHT / LEFT – 750 PSI (52 BAR)

1. Install pressure gauge at port MP of Main Valve

Bank.

2. Activate Swing Right or Left and hold to the turntable

stop. Take pressure reading.

3. After loosening the relief valve jam nut, adjust valve

clockwise to increase pressure or counterclockwise
to reduce pressure accordingly.

USE CAUTION NOT TO EXCEED A RELIEF VALVE SETTING OF 750
PSI (51 BAR) AS COMPONENTS OF THE SWING CIRCUIT CAN BE
DAMAGED.

4. Tighten relief valve jam nut and repeat step 2 to ver-

ify setting.

MAIN RELIEF
VALVE

SWING RELIEF
VALVE

Advertising