JLG E300 Service Manual User Manual

Page 168

Advertising
background image

SECTION 5 - HYDRAULICS

5-26

– JLG Lift –

3121253

6. Continue activating the platform rotate switch

momentarily until the assistant sees a clear, uniform
stream of hydraulic fluid flowing from the test hose
into the hydraulic reservoir.

NOTE: An audible change in the tone of the gear pump

should be heard when the air is purged from the
gear pump.

7. Disconnect the pressure test hose from the MP port

on the Main Control Valve.

8. Remove the hose end from the hydraulic reservoir’s

breather/filler port.

9. Install the breather/filler cap.

Advertising