JLG E300 Service Manual User Manual

Page 157

Advertising
background image

SECTION 5 - HYDRAULICS

3121253

– JLG Lift –

5-15

STEER RIGHT – 1400 PSI (97 BAR))

1. Install pressure gauge at port MP of Main Valve

Bank.

2. Activate Steer Right and hold to end of stroke. Take

pressure reading.

3. After loosening relief valve jam nut, adjust valve

clockwise to increase pressure or counterclockwise
to reduce pressure accordingly.

4. Tighten relief valve jam nut and repeat step 2 to ver-

ify setting.

STEER LEFT – 2000 PSI (138 BAR)

1. Install pressure gauge at port MP of Main Valve

Bank.

2. Activate Steer Left and hold to end of stroke. Take

pressure reading.

3. After loosening relief valve jam nut, adjust valve

clockwise to increase pressure or counterclockwise
to reduce pressure accordingly.

4. Tighten relief valve jam nut and repeat step 2 to ver-

ify setting.

STEER RIGHT
RELIEF VALVE

STEER LEFT
RELIEF VALVE

Advertising