JLG E300 Service Manual User Manual

Page 77

Advertising
background image

SECTION 3 - CHASSIS & TURNTABLE

3121253

– JLG Lift –

3-43

of drive link (10) onto manifold (7) with seal ring side
up.

19. Assemble a new seal ring (4) into end cover (2) and

assemble end cover over the alignment studs and
onto the commutator set. If the end cover has only 5
bolt holes be sure the cover holes are aligned with
the 5 threaded holes in housing (18). The correct 5
bolt end cover bolt hole relationship to housing port
bosses is shown below.

NOTE: If the end cover has a valve (24) or has five bolt

holes, use the line you previously scribed on the
cover to radially align the end cover into its original
position.

20. Assemble the bolts (1) and screw in finger tight.

Remove and replace the two alignment studs with
bolts after the other bolts are in place. Alternately
and progressively tighten the bolts to pull the end

Advertising