JLG E300 Service Manual User Manual
Page 119
Advertising
SECTION 4 - BOOM & PLATFORM
3121253
– JLG Lift –
4-21
NOTE: When installing snap rings make sure they are
seated in pin groove and closed properly.
8. Hold new aluminum round bar tightly, then install
new 8-32 x 0.500 self-threading torx head screw into
one end.
NOTE: Maximum tightening torque is 18-20 in-lbs.
CLOSED SNAP RING
SNAP RING NOT
CLOSED PROPERLY
Advertising